Shed Build-Out Update

Just a quick update, the electrical installation is set to begin.

I hired a electrician to take care of the wiring side, but I will be doing all the grunt work. I’ve been a little scared to measure how far I need to dig the trench for the conduit, but I’m guessing it comes in about 75′ with a little tunneling to get under a small section of sidewalk.

The Details

50 amp sub-panel to provide enough power to run a small AC unit, refrigerator, lights and a handful of outlets.

If all goes well I will be able to move my fridge in soon and plan my first brewday. This will give me more time to plan the rest of the build-out.

Question

What type of material should I use for the interior walls?

4/14/18 Update: the trench for the electrical conduit has been dug. Tomorrow I will break-out the concrete and weather permitting, the wiring goes in on Monday.

Advertisement

So This Happened

Homebrewing has always been one of those things were I had to find space to do it. Kitchen, garage, backyard and maybe an unused bathtub. It was always about putting everything back in it’s place, but often misplacing that thing you need right now.

With the move to Sacramento, came the ability to start fresh with a new space. My space to configure how I wish to.

So this 10′ x 12′ shed will be my new brewing space. This is just the start. In the next few months, the plan will start coming together. Stay tuned.